Taking too long? Close loading screen.
Policy Issue

GROW Lot 6 - Ventilation units

Policy Isssue

GROW Lot 6 - Ventilation units

Basic information

State of play

The review of GROW Lot 6 is currently ongoing. The review study was concluded in 2019. The European Commission presented the draft revised GROW Lot 6 Regulations for ventilation units at the Ecodesign Consultation Forum in March 2021. The file has not progressed since then.

At the Consultation Forum meeting on 10 March 2022, the policy officer informed that the Commission has decided to launch an additional technical study, to further analyse the comments received on the most discussed topics and provide technical support on the preparation of the impact assessment.

The additional study was expected to be launched in the summer of 2022 but it has been delayed. It appears still not to have been launched. Once contracted, the study is expected to take 12 months. An online consultation meeting will be held in the first months of the study to present updated proposals from the Commission.

These delays mean that the publication of the amended Regulations are postponed to 2024 at the earliest, and application of the new requirements to 2025.

Related documents

17 May 2022
The Commission made available the draft minutes of the Consultation Forum meeting on space heaters of 10 March 2022. These minutes can be commented upon until 13 June 2022.
1 min read
16 May 2022
On 12 May 2022, a stakeholder meeting took place where the results from the desk research and ongoing test were presented. The tests would end by June. A reporting would follow in the 2nd part of 2022.
3 min read
22 March 2022
An Ecodesign and Energy Labelling Consultation Forum meeting was held on 10 March 2022. It gave an update on the review of Ecodesign and Energy Labelling Regulations for local space heaters.
2 min read
15 February 2022
The European Commission shared with members of the Ecodesign and Energy Labelling Consultation Forum its tentative planning for the first part of 2022. A Consultation Forum meeting providing an update on the review of GROW Lot 6 is foreseen for 10 March 2022....
1 min read
10 December 2021
The Commission made available the draft minutes of the Consultation Forum meeting on ventilation units of 30 March. These minutes can be commented upon until 7 January 2022.
1 min read
02 March 2021
The preparatory study on the revision of the Ventilation Units Regulations took place from March 2019 until September 2020. Meanwhile, the working documents with the draft texts of the regulations have become available. These will be discussed in the Consultation Forum m...
1 min read

Publications

Publication Types (Radio Button)

Legislation

This section contains an all-encompassing collection of all EU legislation of relevance for this policy issue in one place. This not only covers regulatory texts, but also FAQ documents, guidelines, preparatory studies, impact assessments, review studies, harmonised standards, and much more. The database contains most recent publications, but also allows you to go back in time. 

All documents in this section are freely accessible for all members of the Eurovent network that are logged in to the Extranet. If you are not logged in, log in or register for the Eurovent Extranet to download the documents.

GROW Lot 6 – Ventilation units – 2012 Preparatory study on Air conditioning products – Task 1
GROW Lot 6 – Ventilation units – 2012 Preparatory study on Air conditioning products – Task 2
GROW Lot 6 – Ventilation units – 2012 Preparatory study on Air conditioning products – Task 3
GROW Lot 6 – Ventilation units – 2012 Preparatory study on Air conditioning products – Task 4
GROW Lot 6 – Ventilation units – 2012 Preparatory study on Air conditioning products – Task 5
GROW Lot 6 – Ventilation units – 2012 Preparatory study on Air conditioning products – Task 6
GROW Lot 6 – Ventilation units – 2012 Preparatory study on Air conditioning products – Task 7
GROW Lot 6 – Ventilation units – 2012 Preparatory study on Ventilation systems – Task 1
GROW Lot 6 – Ventilation units – 2012 Preparatory study on Ventilation systems – Task 2
GROW Lot 6 – Ventilation units – 2012 Preparatory study on Ventilation systems – Task 3
GROW Lot 6 – Ventilation units – 2012 Preparatory study on Ventilation systems – Task 4
GROW Lot 6 – Ventilation units – 2012 Preparatory study on Ventilation systems – Task 5
GROW Lot 6 – Ventilation units – 2012 Preparatory study on Ventilation systems – Task 6
GROW Lot 6 – Ventilation units – 2012 Preparatory study on Ventilation systems – Task 7 – Annex
GROW Lot 6 – Ventilation units – 2012 Preparatory study on Ventilation systems – Task 7
GROW Lot 6 – Ventilation units – 2019 Review study – Stakeholder meeting 1 – Minutes
GROW Lot 6 – Ventilation units – 2019 Review study – Stakeholder meeting 1 – Slides
GROW Lot 6 – Ventilation units – 2019 Review study – Stakeholder meeting 2 – Discussion document
GROW Lot 6 – Ventilation units – 2019 Review study – Stakeholder meeting 2 – Minutes
GROW Lot 6 – Ventilation units – 2019 Review study – Stakeholder meeting 2 – Slides
GROW Lot 6 – Ventilation units – 2019 Review study – Task 1
GROW Lot 6 – Ventilation units – 2019 Review study – Task 2
GROW Lot 6 – Ventilation units – 2019 Review study – Task 3
GROW Lot 6 – Ventilation units – 2019 Review study – Task 4
GROW Lot 6 – Ventilation units – 2019 Review study – Task 5
GROW Lot 6 – Ventilation units – 2019 Review study – Task 6
GROW Lot 6 – Ventilation units – 2019 Review study – Task 7
Download all

There are currently no documents available in this section.

Search
Click on the magnifying glass icon or press enter to start your search.

Log in

Don't have a Eurovent Extranet account? Register here!

This content is available to Eurovent members only. 

Please log in or register for the Eurovent Extranet to access full content.